Andy Brownsword gives us a blast from the past:
Configurations for Integration Services packages allow us to tailor their execution without needing to redeploy. There are two main ways to manage these configurations – Package Configuration and Project Configuration. In this post we’ll look at the Package Configuration approach.
Package deployment was the original approach, though as Andy points out, it’s no longer the default.